Home

Domestic Engineering

Commercial Engineering

Portfolio

The Practice

Contact Us


Ring me today at:

Landline +3536731878

Mobile +353862302819

Wanna get our awesome news?

We will send you emails only several times per week. Isn't that cool?

Subscribe!

Actually we will not spam you and keep your personal data secure

Hollywood Consulting Engineering Hollywood Consulting Engineering

Stormwater Management Project for 200 Housing Units at Old Cratloe Road, Limerick 

  • RESIDENTIAL DEVELOPMENT AT OLD CRATLOE ROAD
  • CLIENT: CUSTOM CONSTRUCTION LTD
  • VALUE: €41m
  • Description:
    This project involving over 200 housing units was undertaken between 2003 – 2007 and involved designing surface water runoff to discharge into a storage pond incorporating Hydrobrake to control flow to Greenfield runoff rates. The foul sewer was designed to connect to the public sewer. Micro Drainage Design Suite was used to design foul, storm network and storage.

Send